HID Jack Up Offshore Work Platform In Egypt For Maritime Project
This set of jackup offshore work platform is an excellent case designed and built for the “Seaworks”company in Egypt.
The jackup has many advantages such as flexible modeling structure, convenient disassembly and assembly, flexible transportation mode, simple operation, reliable performance, short construction period and low construction cost.
It has set a benchmark for the construction and development of similar products in China, especially in the improvement of the pile leg lifting system of the platform, and has made a major breakthrough. The improvement of the lifting system not only effectively reduces the construction cost, but also makes the working performance more reliable.
The use of this platform has enabled the “Seaworks” company to save nearly 70% of the investment cost compared with the traditional construction process, and shorten the construction time by nearly half.
The outstanding performance of the jackup was highly praised by our client Mr. Mohamed, CEO of the “Seaworks”.
Project schedule:
Equipment delivery time : 28th September 2019
Put into operation: 6th November 2019
Project completion time : At the end of March 2020
Main technical specifications :
No. | Item | Specifications | Remark |
1 | Total Length | 15.6m | |
2 | Pontoon Depth | 1.8m | |
3 | Breadth | 12.5m | |
4 | Spud Length | 18.0m | |
5 | Spud Diameter | 720mm | |
6 | Air Gap | 2.0m | |
7 | Max. Water Depth | 12.0m | |
8 | Max. Wave Height | 1.0m | |
9 | Hydraulic Cylinder Cylinder Diameter | 273mm | |
10 | 64kw @ 1500r/min | ||
11 | Deck Load Capacity | 12 T / m2 |
The use of HID jackup offshore work platform ensures that our client “Seaworks” company has completed all project work quickly, efficiently, economically and reliably.