HID Jack Up Offshore Work Platform In Egypt For Maritime Project

This set of jackup offshore work platform is an excellent case designed and built for the “Seaworks”company in Egypt.


jack up platform



The jackup has many advantages such as flexible modeling structure, convenient disassembly and assembly, flexible transportation mode, simple operation, reliable performance, short construction period and low construction cost.

It has set a benchmark for the construction and development of similar products in China, especially in the improvement of the pile leg lifting system of the platform, and has made a major breakthrough. The improvement of the lifting system not only effectively reduces the construction cost, but also makes the working performance more reliable.

The use of this platform has enabled the “Seaworks” company  to save nearly 70% of the investment cost compared with the traditional construction process, and shorten the construction time by nearly half.

The outstanding performance of the jackup was highly praised by our client Mr. Mohamed, CEO of  the “Seaworks”.


jackup


Project schedule:

Equipment delivery time : 28th September 2019

Put into operation: 6th November 2019

Project completion time : At the end of March 2020

Main technical specifications :

No.

Item

Specifications

Remark

1

Total Length

15.6m


2

Pontoon Depth

1.8m


3

Breadth

12.5m


4

Spud Length

18.0m


5

Spud Diameter

720mm


6

Air Gap

2.0m


7

 Max. Water Depth

12.0m


8

Max. Wave Height

1.0m


9

Hydraulic Cylinder Cylinder  Diameter

273mm


10

Generator Set

64kw @ 1500r/min


11

Deck Load Capacity

12 T / m2




The use of  HID jackup offshore work platform ensures that our client “Seaworks” company has completed all project work quickly, efficiently, economically and reliably.